Venue:
Library of Marine Biological Laboratory,
University of the
Time:
March 28, 2007

Participants:
Chinese
Summary
of meeting:
1 Reviews on SAKE 2006
1.1 Steering Committee Meeting in
=> plan of activity:
1.2 Training Workshop in
1.3 Training Workshop in
1.4 Workshop in
1.5 The committee members are satisfied with the progress of above
activities and wish to continue the efforts in promoting the cooperative study
and research.
2 Plan for SAKE 2007
2.1 Prof. Liu presented the
processing of Formosat-2 images in detecting fish pens in
It is clear that refined processing of satellite images can result sharpen
images of fish pen that is about the size of 10 to
2.2 Training Program in Bolinao,
March 27-29,
2.2.a 3/27 from Hotel to UP MSI Bolinao Marine Laboratory (6 pm)
2.2.b 3/28 Prof. Laura David chairs the joint training program of remote sensing application for local professionals and APEC SAKE participants
2.2.c Ms. Sheila Santander gives a talk on the
culturing program of Giant Clam and many marine organisms.
Tour of Hatchery

Hatchery for Sea Urchin


Hatchery for Red Coral

Hatchery for Sea Cucumber

Hatchery for giant Clams


2.2.d 3/29 Cruise to
(1) coral bed that is compatible with the coral bed in
(2) visit Giant Clam Farm and mariculture farm north of
(3) test of V-fin
2.2.e The committee accepts the above plan of training program
2.3 Training Program of SAKE 2008
will be held in National Central University, Jhongli, Chinese Taipei
The target dates are the first two weeks in Nov. 2007
It is a joint program with IGBP/SARCS
International Geosphere Biosphere
Programme
Southeast Asia Regional Center for
START
START is a training program of IGBP
Major topics are applications of remote sensing in the study of global change
expected support for SAKE participants:
one fully sponsored trainee from each
country of Indonesia, Philippines and Viet Nam
the emphasis shall be in Marine
Resource Conservation
2.3.a The committee wishes some quota being allocated to the member of
SAKE project if the training program is realized.
2.4 Workshop of SAKE 2007
Venue: Lombok/Jakarta/Bali,
Date: Early November 2007
LOC: Dr. Nani
2.4.a The committee accepts above plan of SAKE-2 Workshop.
3 Plan for SAKE 2008
3.1 Proposed activity:
Steering Committee Meeting (Venue and Dates): to be decided
Training Program (including field trip): June 2008 (LOC: Dr. Nani and Dr.
Workshop:
3.2 The committee suggests that the detailed planning should be after the approval of SAKE 2008 project by APEC BAC (Budget and Allocation Committee)
Appendix I: Pen Fishery in
Appendix II: Announcement of SAKE 2007 Steering Committee Meeting (PDF)